K-12 Education

Public School 338K

Public School PS338K

Our most recent project on the boards is a new primary/intermediate school on Coney Island Avenue in Brooklyn, New York. This new school is being designed to accommodate 742 students in 105,000 Gross [...]

Learn more

Public School 8K

Public School 8K

The project is located at 37 Hicks Street, Brooklyn New York, 11201, and is an addition to the existing primary school. The existing building comprises of a basement and three story masonry […]

Learn more

Public School 89K

Public School 89K

The project is located at the corner of Warwick Street and Atlantic Avenue in Brooklyn, with a capacity of approximately 480 students. The school incorporates 56,000 GSF with a 3,000 Sq. Ft. playground […]

Learn more

PS IS 128Q

PS IS 128Q

PS/IS 128Q is a new school of approximately 100,000 s.f. and occupying an entire city block in the Middle Village area of Queens. The school has a capacity of 648 students. Offering a full PS/IS […]

Learn more

Public School 273

Public School 273

This Early Childhood Center incorporates a full program for Pre-K through third grades. The building is 40,000 Sq. Ft. with a full basement and four floors. The square footage requirements […]

Learn more

Public School 244Q

Public School 244Q

P.S. 244Q is a new Early Childhood Learning Center in Flushing Queens. The site is located in a tight urban area surrounded by apartment buildings. The design of the project is intended to create a bright cheerful oasis of learning […]

Learn more

Gregorio Luperon High School

Gregorio Luperon High School

Gregorio Luperon High School is a new high school for math and science located in Washington Heights. The project is currently under construction with a scheduled completion date of September 2008 […]

Learn more

IS 77Q

IS 77Q

Intermediate School 77Q was part of the NYCSCA Design/Build program. BPA were responsible for providing architectural design services and assisting the SCA throughout the construction period […]

Learn more

Hartford IAE

Intensive Education Academy

At the Intensive Education Academy located on Main Street West Hartford Ct, BPA designed a new addition to the existing K-12 magnet school. This challenging program includes a new Auditorium […]

Learn more

Public School 91

Public School 91

Square Footage: 45,000 Construction Cost: $23M P.S. 91Q, part of the NYCSCA design build program. Purcell Architects as the design architects were responsible for the design, planning approval, zo [...]

Learn more

Public School 124

Public School 124

Public School 124Q was part of the NYCSCA Design/Build program. BPA were part of the Design/Build team for this project providing full architectural design services to the contractor […]

Learn more

IS 230

IS 230

The building comprises of 101,000 s.f. and was designed and constructed on a fast-track basis under the NYCSCA Design/Build program. This project was one of the first design-build contracts issued by […]

Learn more

Public School 20

Public School 20

Square Footage: 45,000 Construction Cost: $18M The addition and renovation to PS 20 in Queens comprises of a 45,000 sq. ft. addition and the renovation of approximately 100,000 square feet […]

Learn more

PS 75K Auditorium Upgrade

QVHS

This project entailed the upgrade of the existing school auditorium. Purcell Architects provided specific design services on this project in the area of interior finishes of the auditorium […]

Learn more

QVHS Auditorium Upgrade

QVHS

This project entailed the major upgrade of the existing school auditorium. An analysis of the existing building conditions related to the upgrading of the auditorium was completed and a scope report […]

Learn more

Library Renovation and Addition

PS 151 Lyndon B. Johnson School

PS 151 Lyndon B. Johnson School, Brooklyn, NY This Library renovation and extension was done by combining the existing library space (950 SF) with an adjacent classroom. Total new library space is [...]

Learn more

PS 38K

PS 38K

Low Voltage Electrical System Upgrade; Cinder Concrete Slab Reinforcing; Windows Replacement

Learn more

PS 76Q William Hallet

PS 76Q William Hallet

Windows Replacement; Exterior Masonry Upgrade

Learn more

PS 287K Bailey K. Ashford

PS 287K Bailey K. Ashford

School Safety Upgrade; Concrete Pavement Upgrade

Learn more

Academy for American Studies Q450

Academy for American Studies Q450

Cinder Concrete Slab Reinforcing

Learn more

Richmond Hill High school Q475

Richmond Hill High school Q475

Exterior Masonry Upgrade; Flood Elimination; Parapets Reconstruction

Learn more

IS 235Q Academy of American Studies

IS 235Q Academy of American Studies

Reso Science Laboratory Upgrades

Learn more

PS 31K

PS 31K

Auditorium Upgrade; Flood Elimination; Windows Replacement; Parapets Reconstruction; Exterior Masonry Upgrade

Learn more

IS 61K Gladstone H. Atwell

IS 61K Gladstone H. Atwell

Science Lab Upgrades

Learn more

PS 14

PS 14

Roofs Renovation; Exterior Masonry Upgrades; Windows Replacement

Learn more

PS 20K Clinton Hill

PS 20K Clinton Hill

Windows Replacement

Learn more

PS 94K

PS 94K

Exterior Masonry Upgrades

Learn more

PS 132X

PS 132X

Interior Structural Analysis

Learn more

PS 151K Lyndon B. Johnson School

PS 151K Lyndon B. Johnson School

Library Upgrade; Auditorium Upgrade

Learn more

PS 164K Caesar Rodney

PS 164K Caesar Rodney

Chimney Repair; Auditorium Upgrade

Learn more